High Performance
1) Trinity Center Leeds
We had to grit blast the steel and then apply a five coat system to give the required protection and cosmetic finish to all the steel work in the roof. We were working off scaffolding and had to complete the project before the glass could be lifted into place.
2) Wolverhampton Wanderers Molineux north Stadium
We painted all the steel in the stadium working off a 125 foot cherry picker from the pitch side reaching up to paint the large truss and rafters. On the back of the stadium we used a crane and basket to reach the 60 meters to paint the counter balances.
3) Costco Stores
Over the last 3 years we have painted 5 Costco stores which require a high performance finish within a very short time frame.
4) Waste treatment works Arbroath
At Arbroth we had to patch repair 5 waste treatment tanks and the overcoat them completely to give 10 years protection
5) High Visibility paint
At a Gazelle warehouse in Milton Keynes the client wanted 225 columns painting 2 meters high with yellow paint to aid traffic safety.